Paper & Pulp Industry

Do you have water contamination in your paper machine oil? Is your filtration effectively cleaning lubricant in your big reservoirs? A common problem we see in paper industries is an inadequate dirt capacity for lubricant filtration systems. We recommend paper mill preventive maintenance.

ESI provides lubricant maintenance and chemical cleaning services that result in contaminant-free machine oil, increased production and improved fluid movement throughout your facility. New equipment installations, planned maintenance and shutdowns, or emergency situations—PetrolinkUSA will help you ensure your systems are contaminant-free, efficient and ready to run for years to come.

We work with you on a daily basis while onsite to ensure you have the proper tools to maintain dry oil and the ROI of your filtration equipment.  Additionally, we have the ability to custom manufacture filters for your specific application to ensure your oil is running at top health and reliability of your equipment is extended.

Reliability Services

  • High-Velocity Oil Flushing and Varnish Removal
  • Chemical Cleaning
  • Leakage Oil Reclamation
  • Emergency Water and Particulate Removal
  • Oil Sampling and Analysis


Reliability Equipment and Products

  • Vacuum Dehydration Units
  • Lube Oil Filters
  • Breathers
  • Fluid Handling Solutions
  • Custom Auxiliary Filtration


ESI airshiped a high volume oil flush equipment to our plant in Greece when a previous contractor failed to successfully flush a 600mw turbine with conventional methods. The team from ESI completed the flush in 7 days, exceeding the cleanliness specification with the manufacturer providing warranties and our expectations.

European Chemical Plant - Plant Maintenance Manager

ESI provided turnkey pre-engineering and steam blow services for our two 600mw coal-fired boilers at our plant in Paiton Indonesia. The pre-engineering and detailed procedures submitted prior to the actual work ensured that the multi-million pound per hour steam blows were successfully completed in ten days instead of the months it would have taken going the conventional route.

Paiton Indonesia Coal-Fired Boilers - Internal Project Engineer