Power Generation & Power Plant Services

Are your PCB testing requirements up to date? Do you have a need for lube oil quality testing and dissolved gas analysis testing for your transformers? Do you need a certified technician to provide your company with turnkey transformer oil distillation?

When looking for transformer oil testing companies, ESI specializes in analysis, quality testing, and oil distillation for the power generation industry. Our transformer preventive maintenance includes the latest in transformer oil testing equipment. Our certified lubricant analysis technicians provide the following services for power plants:

Reliability Services

  • Reservoir Cleaning
  • Varnish Mitigation
  • Fluid Handling Upgrades
  • Custom On & Off Filtration
  • Vacuum Dehydration & Oil Reclamation
  • Chemical and Lube Oil Flushing for Turbines, Compressors, Gears, and Generators
  • EHC Flushing
  • High Velocity Oil Flushing
  • Chemical Cleaning
  • Emergency Water and Particulate Removal
  • Oil Sampling and Analysis, Including Transformer Oil Sampling + Analysis

Reliability Equipment and Products

  • Vacuum Dehydration Units
  • Lube Oil Filters
  • Breathers
  • Fluid Handling Solutions
  • Custom Auxiliary Filtration

We have the knowledge and field experience to be your go-to reliability partner. We ensure your transformers are always up-to-date on all scheduled & required testing.

Client Testimonials

ESI airshiped a high volume oil flush equipment to our plant in Greece when a previous contractor failed to successfully flush a 600mw turbine with conventional methods. The team from ESI completed the flush in 7 days, exceeding the cleanliness specification with the manufacturer providing warranties and our expectations.

European Chemical Plant - Plant Maintenance Manager

ESI provided turnkey pre-engineering and steam blow services for our two 600mw coal-fired boilers at our plant in Paiton Indonesia. The pre-engineering and detailed procedures submitted prior to the actual work ensured that the multi-million pound per hour steam blows were successfully completed in ten days instead of the months it would have taken going the conventional route.

Paiton Indonesia Coal-Fired Boilers - Internal Project Engineer